Published July 2026 · 8 min read

The listing checklist,
everything before submit.

Most rejections are not judgement calls. They are a missing feature graphic, a privacy policy that 404s, or a demo account nobody tested. This is the list we run before every submission, in the order it saves the most time. If a term on it is unfamiliar, the glossary defines it. For the five required assets in submission order, with the tool for each, follow the guided walkthrough.

Apple required 2 screenshot sizes Play required Feature graphic Both require Privacy policy URL Fix later? Not on Apple

Before you open the console

Text

Images

Compliance

If the app has a login or paid content

The hour before you hit submit

  1. Open the listing preview and read it as a stranger. Does the first screenshot say what the app does?
  2. Check the screenshots against the build one more time. UI drifts during a release week.
  3. Confirm the privacy policy URL loads in a private window.
  4. Confirm the demo account works from a signed out device.
  5. Check the release is going where you intend, phased or immediate, all territories or some.

Screenshots are the item on this list that cannot be quietly fixed later on the App Store. They are version level metadata, so a typo waits for your next release. Everything else here can be corrected in the console within hours.